Services

MAURITANIA 225 kV & 33kV TRANSMISSION LINES
Nature-based solutions
MAURITANIA 225 kV & 33kV TRANSMISSION LINES


Project Detail

Project Location:Mauritania

Client:SINOTEC

Project Introduction: Design, Supply, Installation, Testing and Commissioning for 225 kV & 33kV transmission. The 225kV double-circuit overhead line includes three sections and the total length is about 669.1 km. The 33kV double-circuit overhead line is about 38.85km.

Service Scope: Engineering Design & PMC