PHILIPPINES MINDANAO SUBSTATION REHABILITATION PROJECT (Mt-0387)
Nature-based solutions
PHILIPPINES MINDANAO SUBSTATION REHABILITATION PROJECT (Mt-0387)


Project Detail

Project Location:Philippines

Client:Sieyuan Electric Co., Ltd.

Project Introduction: The Scope under the project includes furnishing, supplying, hauling, installing, testing and commissioning of two 7.5MVAR 69kV Capacitor Bank. The project also includes replacement of obsolete 138 & 69kV Power Circuit Breaker including its associated equipment and material with all associated H.V. equipment and materials as shown in the single line diagram and plan & layout drawings on each substation.

Service Scope: Engineering Design