Project Introduction: The Scope under the project includes furnishing, supplying, hauling, installing, testing and commissioning of two 7.5MVAR 69kV Capacitor Bank. The project also includes replacement of obsolete 138 & 69kV Power Circuit Breaker including its associated equipment and material with all associated H.V. equipment and materials as shown in the single line diagram and plan & layout drawings on each substation.