SP440 69KV TRANSMISSION LINE PROJECT DESIGN & PROCUREMENT
Nature-based solutions
SP440 69KV TRANSMISSION LINE PROJECT DESIGN & PROCUREMENT
Project Detail

Project Location: Pangasinan and Tarlac, Philippines

Client: China Gezhouba Group Electric Power Co., Ltd / Hengtong Optic-electric C0., Ltd.

Project Introduction: The total length of 69kV transmission line project of NGCP is 55km, including 278 sets of towers, double-circuit conductors. The foundation adopt mat foundation and bored pile. 

Service Scope: Engineering Design, Partical Procurement, Construction.