Project Location:Vietnam

Client:China Gezhouba Group Electric Power Co., Ltd

Project Introduction: Beta VNM wind power plant is located in Vietnam,with total installed capacity of 50 MW, including 10 wind turbines; 22/110 kV substation with one 63 MVA transformer bay; 110 kV transmission line connecting the Beta VNM WPP 22/110 kV substationto the National power grid with total length of 4.9 km; 110 kV outgoing bay for expansion at Buon Ho 110 kV substation for connection of wind power plant to National power grid; 22 kV connection line from the wind turbines to Beta VNM WPP 22/110 kV substation. Access road and admistration house for the wind power plant.

Service Scope: Meena provide Engineering Design, Project Management and Construction

BETA VNM 50MW WIND POWER PLANT

Beta VNM wind power plant is located in Vietnam,with total installed capacity of 50 MW

vietnam, 50mw

The Project is located in Vietnam and includes 50MW wind with 132kV substation

vietnam, 24mw

The 24MW wind plant is located in Vietnam and is the first phase of the wind projects done there