Client: China Gezhouba Group Electric Power Co., Ltd
Project Introduction: Design of 2 new construction 230/132kV substation, 1 new construction of 132kV substation, 1 400/230kV substation extension and 1 132/33kV substation extension; Design of 230kV double circuit overhead transmission line with length of 339.3km, 132kV double circuit overhead transmission line with length of 76.3 km, 132kV single circuit overhead transmission line with length of 12.5km