Services
Project Location:Philippines
Client:CEEC-GEDI
Project Introduction: Design of 500kV IPP substation; 500MVA/500/33KV TRS. 10 BAYS; 33KV MCSG 52 SETS; 500kV OHTL: Double Circuit, Four Split Conductor, 11KM; 500kV connection substation bay extension: 500kV AIS bay: 2 bays
Service Scope: Engineering Design