Services

SUDAN 220KV UPPER ATBARA-SHOWAR TRANSMISSION LINE
Nature-based solutions
SUDAN 220KV UPPER ATBARA-SHOWAR TRANSMISSION LINE
Project Detail

Project Location: Sudan

Client: Shanghai Electric Power Transmission & Distribution Engineering Co. Ltd

Project Introduction: Design, Supply, Installation, Testing and Commissioning of 28km 220kV Double Circuit transmission line and two bays extension in 220kV Showak Substation which is located.

Service Scope: Engineering Design